NaviBoss NaviBoss

PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS

Revithoussa Terminal

GRREVGreece37°57.0′N 023°23.0′EUpdated Jul 2025Open in the Ports tool

KEY DATAUTC+2 · IALA A · deepest berth 12.00 m draught
INSPECTIONSParis MOU port.

Key data

updated Jul 2025
LOCAL TIMEUTC+2Clocks go to UTC+3 on 28 Mar 2027. Back to UTC+2 on 31 Oct 2027.worked out from the port's time zone
LOAD LINE ZONESummer
IALA REGIONARed to port when entering.from the country
MAX SIZELOA 345m, beam 50m, draught 12m and 180,000DWT. (Note: Vessels exceeding 180,000DWT may be granted).

Size limits

LOA 345m, beam 50m, draught 12m and 180,000DWT. (Note: Vessels exceeding 180,000DWT may be granted).

Load line zone

Summer

Max draft per terminal

TerminalMax draughtMax LOABerths
Revithoussa LNG Terminal12.00 m345 m1

Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.

Inspections

Port State Control here: Paris MOU.

Running now: the Paris and Tokyo MOU concentrated inspection campaign on cargo securing, 1 September to 30 November 2026. Its questions are published: the questionnaire.

ISPS

ISPS Designated Authority: Ministry of Merchant Marine.

Address: 1 K. Paleologou Street, 185 35 Piraeus, Greece.

Tel: +30 210 419 1911/43.

Fax: +30 210 419 1901.

Email: [email protected], [email protected]

For further ISPS information see IMO website http://www.imo.org

About Revithoussa Terminal

updated Jul 2025

Where it is

Revithoussa Terminal is located at Rivithoussa Island, 40km W of Athens, Greece.

The port

Revithoussa Terminal, situated on the islet of Revithoussa near Athens, Greece, serves as a critical infrastructure facility in the country's energy sector. As the only terminal in Greece capable of receiving Liquefied Natural Gas (LNG) cargoes, it plays a vital role in the importation, storage, and distribution of natural gas.

Operated by DESFA S.A., Revithoussa Terminal features a substantial storage capacity of 225,000m³ of LNG. This capacity allows the terminal to temporarily store large volumes of LNG, ensuring a steady supply to meet fluctuating demand. The facility is equipped with advanced regasification technology, which converts LNG back into its gaseous form, making it suitable for distribution through the National Natural Gas Transmission System.

Questions about Revithoussa Terminal

What time zone is Revithoussa Terminal in?

Local time at Revithoussa Terminal is UTC+2. Clocks go to UTC+3 on 28 Mar 2027. Back to UTC+2 on 31 Oct 2027.

What is the maximum draft at Revithoussa Terminal?

The deepest berth listed is at Revithoussa LNG Terminal: 12.00 m maximum draught. The "Max draft per terminal" table gives each terminal's figure.

Which load line zone is Revithoussa Terminal in?

Summer

Who carries out Port State Control at Revithoussa Terminal?

Port State Control at Revithoussa Terminal: Paris MOU.

What is the UN/LOCODE of Revithoussa Terminal?

The UN/LOCODE of Revithoussa Terminal is GRREV.

Tips from seafarers

What crews who called at Revithoussa Terminal say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.

Read and add tips for Revithoussa Terminal →

Plan a route to Revithoussa Terminal →

A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.