PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS
Posorja
Key data
updated Apr 2019Size limits
Max draught 15m.
Max draft per terminal
| Terminal | Max draught | Max LOA | Berths |
|---|---|---|---|
| Posorja Deepwater Port | 15.00 m | — | 2 |
Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.
Approach
updated Oct 2019Approach
The access channel to the Guayas River is 16m deep and 21nm long.
Anchorages
An anchorage for small vessels situated 2nm N of the port, (02°42.3'S 080°14.5'W).
Charts and publications
BA 509, 586, 2257, 3092.
Inspections
ISPS
ISPS Designated Authority: Direccion General de la Marina Mercante y del Litoral, Secretaria de Proteccion Maritima.
Position: Superintendente de Autoridades Portuarias.
Address: Elizalde 101 y Malecon, Guayaquil, Ecuador.
Tel: +593 4 232 4827
Fax: +593 4 232 4827
Mob: +593 9 402 9527
Email: [email protected]
Telex: 43325.
For further ISPS information see IMO website http://www.imo.org
About Posorja
updated Oct 2019Where it is
Posorja is located in the southern most point of Ecuador, 70km from the port of Guayaquil, opposite Puna Island.
The port
The first deep water port in Ecauador, with a current capacity to receive vessels of up to 15,500TEU. Chosen for its strategic location, DP World have a 50 year concession as operator from the Government of Ecuador. Phase I has been completed and includes the dredging of the new access channel, a 20km access road and 400m of new quay handling containers and break bulk. Posorja will be able to receive larger Post-Panamax vessels on longer berths and will complement the nearby inland port of Guayaquil.
Questions about Posorja
What time zone is Posorja in?
Local time at Posorja is UTC−5. No summer time.
What is the maximum draft at Posorja?
The deepest berth listed is at Posorja Deepwater Port: 15.00 m maximum draught. The "Max draft per terminal" table gives each terminal's figure.
What is the UN/LOCODE of Posorja?
The UN/LOCODE of Posorja is ECPSJ.
Tips from seafarers
What crews who called at Posorja say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.
A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.