PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS
Porto do Acu
Pilot
updated Jul 2020- Porto do Acu pilot boarding place, Terminal 1 Pilot boards21°50.0′S 040°46.7′W
- Porto do Acu pilot boarding place, Terminal 1 alternative Pilot boards21°47.0′S 040°55.0′W
- Porto do Acu pilot boarding place, Terminal 2 Pilot boards21°49.0′S 040°55.0′W
Pilotage service is mandatory for vessels accessing T2. For Porto do Acu, pilotage is available 24hrs a day, 7 days a week, and can be booked by the shipping agent or shipowner directly with the watchtower of ZP-15.
Key data
updated Jul 2020Size limits
Max draught 21.7m, 321,225DWT, LOA 340m, Beam 60m.
Load line zone
Tropical
Max draft per terminal
| Terminal | Max draught | Max LOA | Berths |
|---|---|---|---|
| T1 - T-Oil | 21.70 m | 340 m | 3 |
| T1 - T-Ore | 18.50 m | 300 m | 2 |
| T2 - Terminal Multicargas (T-MULT) | 13.10 m | 250 m | 2 |
| GNA - Gas Natural Acu | 12.00 m | 294 m | 1 |
| T2 - TECMA - Terminal de Combustiveis | 11.00 m | 185 m | 2 |
| T2 - Terminal Intermoor | 8.90 m | 183 m | 1 |
| T2 - Terminal NOV | 8.90 m | 183 m | 1 |
| T2 - Technip - Fabrica de Flexiveis | 8.57 m | 183 m | 1 |
| T2 - B-Port - Terminal Offshore | 7.20 m | 162 m | 1 |
| T2 - Cais da OSX | 6.00 m | 145 m | 1 |
| T2 - Molhe Sul | — | — | 1 |
Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.
Approach
updated Jun 2020Approach
T1 Offshore Channel: Dredged to 21.0m. depths alongside 19.0m eventually to be between 21m to 26m.
T2 Onshore Channel: Length 3,500m, width 300m, depths alongside will eventually be up to 18m.
Traffic schemes and VTS
A VTS radar system is in place which enhances navigation safety in the T2 channel. Installed at the Operational Maritime Traffic Control Centre, the radar has a range of 25nm (50km). Acu port is the first port in Brazil to have this system. Monitoring is performed through surveillance cameras and sensors, which receive data that permits the monitoring and controlling of marine traffic.
Charts and publications
BA 8261, 495, 496.
Inspections
ISPS
ISPS Designated Authority: Comissao Nacional de Seguranca Publica nos Portos, Terminais e Vias Navegaveis - CONPORTOS.
Contact person: Ezio Borghetti.
Position: Secretario Executivo.
Address: Esplenada dos Ministerios, Bloco T, 5 andar - Ministerio da Justica, DF, 70064-900, Brasilia, Brazil.
Tel: +55 61 429 3173.
Fax: +55 61 429 9169.
E-mail: [email protected]
Website: http://www.mj.gov.br
For further ISPS information see IMO website http://www.imo.org
About Porto do Acu
updated Jul 2020Where it is
Porto do Acu is being developed in Sao Joao da Barra, in the north of Rio de Janeiro State, approx 100km NE of Macae.
The port
There are two distinct separate port areas:
Terminal 2 (T2 Onshore) is an inner harbour which has been dug out of the existing coastline into a 6.5m long dock area, and a 300m wide approach channel with a depth of 14.5m. With a wharf line of over 13 km, T2 will handle project cargo, coal, bauxite, vehicles, liquid and solid bulk and oil.
Two large breakwaters have been built which protect the inland harbour entrance.
The port will have a total quay line of over 13km and be able to handle dry bulk, liquid bulk, steel products, coal, pig iron, slag, granite, general cargo and vehicles.
The new port area will cover 90km² and will also include steel mills, power plants and iron ore hydrocyclone and pelletising plants. T2 Onshore will have an OSX shipbuilding yard, for the construction and repair of FPSO's, platforms and modules for offshore exploration. Other facilities to include an oil processing plant, cement and auto factories. Many international companies have already started up operations in the area. Edison Chouest have set up the largest offshore supply base in the world at Acu.
Terminal 1 (T1 Offshore) consists of a 3,600m long access pier extending from the shoreline, with two finger piers at the end. Eventual total of nine berths for VLCC's and Chinamax vessels. Five for oil and four for iron ore.
Questions about Porto do Acu
Where does the pilot board at Porto do Acu?
The pilot boards at Porto do Acu pilot boarding place, Terminal 1, 21°50.0′S 040°46.7′W. Porto do Acu has 3 pilot boarding places.
What time zone is Porto do Acu in?
Local time at Porto do Acu is UTC−3. No summer time.
What is the maximum draft at Porto do Acu?
The deepest berth listed is at T1 - T-Oil: 21.70 m maximum draught. The "Max draft per terminal" table gives each terminal's figure.
Which load line zone is Porto do Acu in?
Tropical
What is the UN/LOCODE of Porto do Acu?
The UN/LOCODE of Porto do Acu is BRACX.
Tips from seafarers
What crews who called at Porto do Acu say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.
Plan a route to Porto do Acu →
A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.