NaviBoss NaviBoss

PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS

Palanca Terminal

AOPATAngola06°07.6′S 012°19.2′EUpdated Apr 2022Open in the Ports tool

PILOTPilot boards at Palanca Terminal pilot/mooring-master boarding place.
KEY DATAUTC+1 · IALA A

Pilot

updated May 2010
1
Blue: Palanca Terminal. Magenta: where the pilot boards (numbered as the list). Drawn by NaviBoss for planning, not for navigation.
  1. Palanca Terminal pilot/mooring-master boarding place Pilot boards06°55.5′S 012°22.5′E

Compulsory. Pilotage is carried out by a pilot of Sonangol Pesquisa e Producao who will remain onboard during the entire duration of call. Pilot takes control of the vessel approximately 2.2nm x 330° direction (NNW) from the loading station or at the anchorage.

Key data

updated Apr 2022
LOCAL TIMEUTC+1No summer time.worked out from the port's time zone
WATER DENSITY1025.
LOAD LINE ZONETropical.
IALA REGIONARed to port when entering.from the country
MAX SIZESPM: LOA 333m, beam 60m, 319,360DWT.

Size limits

SPM: LOA 333m, beam 60m, 319,360DWT.

Water density

1025.

Load line zone

Tropical.

Tides

Max 1.9m above CD at springs, average 0.9m.

Max draft per terminal

TerminalMax draughtMax LOABerths
Palanca Terminal—333 m1

Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.

Approach

updated Apr 2022

Anchorages

Recommended anchorage for loading is 5.4nm WNW from the loading station, 06°55.1'S 012°18.5'E.The depth is approx 50m and the sea floor is sandy and of good consistency for anchoring.

Prohibited anchorage: It is strictly prohibited to anchor in the area within 1.5nm of the line of pipes connecting PAL F2 to PAL P1 and from PAL P2 to the storage vessel and at least 1nm from the loading station.

Note: Anchors should be stowed and lashed when near the area and anchoring should only be in agreed/recognised anchorage areas.

Restrictions

There is no berthing after 1500hrs. Vessels will wait until 0700hrs the following morning.

The production facilities are protected by an area prohibiting navigation which extends 0.5nm around all fixed installations. Access to this area is authorised only to vessels working for Sonangol Pesquisa e Producao or authorised by it. There are submarine pipelines in and around the Palanca field as well as between Palanca and Lombo East Oilfield NNE.

Tugs

Pilot uses one tug for the mooring. Available throughout 24 hours. Mooring is carried out in daylight between 0600 and 1500hrs LT.

Mooring

Mooring is carried out between 0600 and 1500hrs. Mooring can take place at night but only in exceptional circumstances. Departure can occur on completion of loading, day or night.

Tandem mooring: The vessel should be prepared to take onboard the hawser as close as possible to the axis of the vessel. The mooring line consisting of 55m of 16in rope.

Charts and publications

BA 306, 311,1209, 4203, 4209. Admiralty Pilot NP2, NP286(8).

Inspections

ISPS

ISPS Designated Authority: National Directorate of Merchant Marine and Ports.

Contact person: National Director.

Address: CP 2393, Rua Rainha Ginga, No 74, 4 Andar, Luanda, Angola.

Tel: +244 2 390034.

Fax: +244 2 310375.

Mob: +244 92 439336/ +244 91 516620.

Telex: 3352 MARPORT AN

E-mail: [email protected]

For further ISPS information see IMO website http://www.imo.org.

Port services

updated Oct 2013

Bunkers, water and stores

Bunkering: Not available.

Medical

No facilities available. Emergencies are flown to Luanda.

Transport

Nearest airport: Quinzau (36.2km) and Luanda, situated 4km from the city.

Airport facilities: On average one flight per day to Europe. It should also be noted that the Palanca production platform has a fully operational helicopter landing pad.

Working hours

Throughout 24 hours.

About Palanca Terminal

updated May 2010

Where it is

Palanca Terminal is situated 23nm W of Ponta Quinzau and 57nm SSE of the entrance to the River Congo.

The port

The terminal consists of an oil production arrangement of offshore platforms, a floating storage barge, the "Palanca", 274,000DWT and an auxiliary CALM buoy. Loading is performed either in tandem with the FSU or at the SBM buoy.

The terminal is approached and entered through a restricted area.

Questions about Palanca Terminal

Where does the pilot board at Palanca Terminal?

The pilot boards at Palanca Terminal pilot/mooring-master boarding place, 06°55.5′S 012°22.5′E.

What time zone is Palanca Terminal in?

Local time at Palanca Terminal is UTC+1. No summer time.

What is the water density at Palanca Terminal?

1025.

Which load line zone is Palanca Terminal in?

Tropical.

What is the UN/LOCODE of Palanca Terminal?

The UN/LOCODE of Palanca Terminal is AOPAT.

Tips from seafarers

What crews who called at Palanca Terminal say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.

Read and add tips for Palanca Terminal →

Plan a route to Palanca Terminal →

A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.