PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS
Oro Bay
Pilot
updated May 2010- Oro Bay pilot boarding Pilot boards08°53.2′S 148°28.7′E
Not compulsory. Available for berthing from Lae or Port Moresby with 48 hours notice, not normally available for unberthing.
Key data
updated Apr 2019Size limits
Max draught 10.8m.
Largest vessel handled: "Stolt Integrity", tanker, 32,035DWT.
Water density
1025.
Load line zone
Tropical.
Tides
Range 1.3m.
Max draft per terminal
| Terminal | Max draught | Max LOA | Berths |
|---|---|---|---|
| Oro Bay Port Terminal | 10.80 m | — | 1 |
Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.
Approach
updated May 2010Approach
Approach and entry: Directions: From a position 08°45'S 148°44'E on the recommended track between Cape Nelson and Cape Ward Hunt, Oro Bay is approached on the alignment of leading lights, 0.7nm inland from the head of the bay, as follows:
Front light (08°54'S 148°44'E) on the recommended track between Cape Nelson Cape Ward Hunt, Oro Bay is approached on the alignment 241.5° of leading lights, 0.7nm inland from the head of the bay.
The alignment, which is clear of dangers on the leading line, leads into Oro Bay and then as requisite to the anchorage or main wharf.
Anchorages
Recommended Bay Anchorage: In sand and mud with 15.0m depth on the leading marks (239° x 400m) from N corner of the wharf.
Anchorage is prohibited to landward of the prohibited anchorage zone across the entrance to the bay.
Tugs
Tugs available from Port Moresby with 72 hours notice.
Charts and publications
Aus 385, 644. Admiralty Pilot NP60, NP286(4).
Reporting before arrival
updated Aug 2010ETA and pre-arrival notices
Should be confirmed no less than 12 hours prior to arrival via Port Moresby Radio, and confirmed not more than 5 hours and not less than 4 hours before arrival.
Communications
VHF: "Oro Bay Port Control", Ch 06, 12 and 16. A listening watch is kept during working hours and when a vessel is expected outside of working hours.
Health
Ship Sanitation Control Exemption Certificates available.
Inspections
Port State Control here: Tokyo MOU.
Running now: the Paris and Tokyo MOU concentrated inspection campaign on cargo securing, 1 September to 30 November 2026. Its questions are published: the questionnaire.
ISPS
ISPS Designated Authority: Department of Transport
Address: PO Box 1489, Port Moresby, NCD PNG
Tel: +675 325 7500
Fax: +675 323 3339
Mobile: +675 6813745.
For ISPS information see IMO website http://www.imo.org
Port services
updated Aug 2019Bunkers, water and stores
Fresh water: Available on request at berth by Port Authority.
Bunkering: Available by road tanker if ordered in advance.
Stores: Available.
Medical
Popondetta General Hospital, 43.3 km.
Transport
Nearest airport: Girua Airport located at Popondetta, 25.9km.
Working hours
Normally 0800-2200hrs.
About Oro Bay
updated May 2010Where it is
The port of Oro Bay is situated on a large open bay on the E coast of Papua.
The port
This is a small port which handles both coastal and overseas traffic. General cargo, containers, bulk palm oil and Ro-Ro traffic is handled at the main wharf.
Questions about Oro Bay
Where does the pilot board at Oro Bay?
The pilot boards at Oro Bay pilot boarding, 08°53.2′S 148°28.7′E.
What time zone is Oro Bay in?
Local time at Oro Bay is UTC+10. No summer time.
What is the maximum draft at Oro Bay?
The deepest berth listed is at Oro Bay Port Terminal: 10.80 m maximum draught. The "Max draft per terminal" table gives each terminal's figure.
What is the water density at Oro Bay?
1025.
Which load line zone is Oro Bay in?
Tropical.
Who carries out Port State Control at Oro Bay?
Port State Control at Oro Bay: Tokyo MOU.
What is the UN/LOCODE of Oro Bay?
The UN/LOCODE of Oro Bay is PGROR.
Tips from seafarers
What crews who called at Oro Bay say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.
A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.