PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS
FPSO 'Agbami FPSO'
Pilot
- Anyala Madu Terminal Pilot boards03°48.0′N 005°52.0′E
Key data
updated May 2024Size limits
Max offshore LOA 339.76m, BCM 175M, draught 21m and 323,182DWT.
Load line zone
Tropical zone.
Max draft per terminal
| Terminal | Max draught | Max LOA | Berths |
|---|---|---|---|
| Agbami FPSO | 21.00 m | 340 m | 2 |
Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.
Inspections
ISPS
ISPS Designated Authority: Nigeria Ports Authority.
Position: General Security Manager.
Address: 26/28 Marina, Lagos, Nigeria.
Tel: +234 1 264 5894
Fax: +234 1 264 5894
Mob: +234 80 3301 9750.
For further ISPS information see IMO website http://www.imo.org
About FPSO 'Agbami FPSO'
updated May 2024Where it is
FPSO 'Agbami FPSO' is located 90nm offshore, SSW of the Niger Delta, Nigeria.
The port
FPSO 'Agbami FPSO' is a 337,859DWT vessel, moored in 1,462m of water and is capable of processing 250,000bbls of oil, 12,742,580m³ of gas and 450,000bbls of injected water per day. The FPSO is connected to a nearby SPM for loading export tankers. The SPM is connected to two main product connections: the east oil offloading line (OOL) and the west oil offloading line (OOL). Agbami Crude Oil from the spread-moored FPSO 'Agbami FPSO' is transferred to export tankers berthed at the SPM via OOL and double floating hose string. If tandem moored to FPSO 'Agbami FPSO', Agbami Crude Oil is transferred via a single floating hose string.
The FPSO, amongst the largest in the world, has been servicing Agbami Oil Field since oil production began in 2008, following the discovery of the field in 1998.
Questions about FPSO 'Agbami FPSO'
Where does the pilot board at FPSO 'Agbami FPSO'?
The pilot boards at Anyala Madu Terminal, 03°48.0′N 005°52.0′E.
What time zone is FPSO 'Agbami FPSO' in?
Local time at FPSO 'Agbami FPSO' is UTC+1. No summer time.
What is the maximum draft at FPSO 'Agbami FPSO'?
The deepest berth listed is at Agbami FPSO: 21.00 m maximum draught. The "Max draft per terminal" table gives each terminal's figure.
Which load line zone is FPSO 'Agbami FPSO' in?
Tropical zone.
What is the UN/LOCODE of FPSO 'Agbami FPSO'?
The UN/LOCODE of FPSO 'Agbami FPSO' is NGABM.
Tips from seafarers
What crews who called at FPSO 'Agbami FPSO' say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.
Plan a route to FPSO 'Agbami FPSO' →
A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.