PORT GUIDE · FOR OFFICERS, MASTERS AND SHORE TEAMS
Dongying
Key data
updated Jul 2024Size limits
LOA 229m, beam 47.55m, draught 12.8m, 75,578DWT.
Max draft per terminal
| Terminal | Max draught | Max LOA | Berths |
|---|---|---|---|
| Dongying Liquid Bulk Terminal | — | — | 2 |
| CNOOC Dongying Port | 12.80 m | 229 m | 2 |
| Wantong Petrochemical | 12.00 m | 193 m | 4 |
| Wantong South Harbour | 8.50 m | 159 m | 11 |
| Baogang International Petrochemical | 8.40 m | 142 m | 6 |
| Shundong Terminal | 8.40 m | 146 m | 6 |
| Guangli Port | 7.48 m | 159 m | 6 |
| Dongying Container Terminal | — | — | 1 |
| Dongying Longhai Port | — | — | 2 |
Deepest first. The draught is the largest any of the terminal's berths states; a dash means the source gives none.
Inspections
Port State Control here: Tokyo MOU.
Running now: the Paris and Tokyo MOU concentrated inspection campaign on cargo securing, 1 September to 30 November 2026. Its questions are published: the questionnaire.
ISPS
ISPS Designated Authority: Ministry of Transportation and Communications, Department of Water Transportation.
Contact: Senior Marine Officer.
Address: 11 Jian Guo Men Nei Av, Beijing, 100736, China.
Tel: +86 01 652 92626.
Fax: +86 01 652 92642.
Email: [email protected]
For further ISPS information see IMO website http://www.imo.org
About Dongying
updated Sep 2026Where it is
Dongying port is located a 122nm W of Longkou port.
The port
The main cargoes handled in the port are Ro-RO, LPG and liquid facilities.
Traffic
Approx 100,000,000t of cargo and 70,000 TEU handled annually.
Questions about Dongying
What time zone is Dongying in?
Local time at Dongying is UTC+8. No summer time.
What is the maximum draft at Dongying?
The deepest berth listed is at CNOOC Dongying Port: 12.80 m maximum draught. The "Max draft per terminal" table gives each terminal's figure.
Who carries out Port State Control at Dongying?
Port State Control at Dongying: Tokyo MOU.
What is the UN/LOCODE of Dongying?
The UN/LOCODE of Dongying is CNDYN.
Tips from seafarers
What crews who called at Dongying say: pilot boarding, the agent's papers, inspections, shore leave. Each tip is shown with the writer's rank and ship type, and an AI summary sits on top once there are three or more.
A planning aid, not for navigation. These facts come from public sources and each section shows how old it is. Check with the port, your agent, your ENCs and official publications. Spotted something wrong? Tell us on the feedback board.